Critical operations.
A fleet and dual-data-center connectivity program for a Southwestern power utility.

275vehicles in the signed fleet program
The challenge.
Vehicles and data centers needed a coordinated design for mobile connectivity and facility continuity.
The approach.
- 01
Design for the moving endpoint
Consider coverage, vehicle equipment, antennas, power and satellite together.
- 02
Design for the fixed endpoint
Scope routing and integration for two data centers.
- 03
Work alongside the customer
Plan the phases with the customer engineering team.