
Cisco Catalyst 9300
Access switching for the devices and applications on your network.
Four layers, from the carrier line to the working floor. Each one is planned around the one beneath it.
Placement and RF conditions shape wireless access. A site survey helps turn a device choice into a considered Wi-Fi plan.
Ports, uplinks, power budgets and cable paths connect the equipment on site. Plan them around the devices that use them.
Define which users, devices and applications can reach each other. Security policy and licensing belong in the design.
Carrier service reaches the site through the edge router. Available service, antenna placement and application needs inform the choice.

2 · SecurityCisco Meraki MX67

Bring the site. We plan every layer together.
Talk to a Solutions Expert
Access switching for the devices and applications on your network.

Switching, power and management planned together.

Access switching selected around your network requirements.